The Chartered Institution of Building Services Engineers (CIBSE) have recently released their first alterations to the 'TM13: Minimising the risk of Legionnaires' disease' guide in ten years. This comes following Britain experiencing its worst outbreaks of the disease to date, as well as in reaction to the advances in technology and environmental concern there are in managing water systems.

Legionella bacteria are commonly found in large sources of water such as rivers and lakes, but can very easily contaminate drinking water systems should it not be treated properly. If the bacteria are allowed to multiply and then become released into the air in water droplets, they become a serious health risk. Large buildings suchs as hotels, hospitals and office blocks, are particularly susceptible to contamination due to their more complex water supply systems.

It is aimed at primarily facility/premises managers, engineers, consultants or any other person involved in the design, installation or maintenance of building water systems. It sets to give out guidance on the appropriate design, installation, commissioning, operation and maintenance procedures necessary to minimise the risk of infection by Legionella from water systems within a building. Principles are highlighted, and practitioners in these fields are encouraged to apply them to their own particular building services applications.

This new guide also makes reference to health concerns on an international level, providing guidance on non-UK based requirements in the hope it will be a "valuable tool" in supporting compliance outside of the UK.

Speaking to HVP magazine, chairman for the new guide Greg Davies said: "The guidance has been revised and updated to reflect the legal, environmental and technological advancements we have seen over the last decade. The significant advantage of this document is it contains the level of advice needed to support those responsible for managing and maintaining water systems and services, for minimising the risks with legionella as well as how to demonstrate proactive control."

To purchase a copy of TM13, visit the CIBSE Knowledge Portal

Full story: Daily Mail - 'Incompetent' plumber causes gas explosion

A 32-year old plumber is currently in course after he caused a gas explosion which resulted in a home being 'blown from its foundations' and leaving the couple inside with serious burns.

While converting the former kitchen of Martyn Moody and his wife Theresa's luxury home in the Lincolnshire Wolds into a dining room, plumber Daniel Hickling cut off and capped the protruding gas pipe, burying it under the floorboards. However during the work he punctured the pipe and failed to carry out a straightforward check to ensure there had been no damage to it.

Later the couple smelt gas and began searching their home. During this time Mr Moody flicked on a cigarette lighter and the flame ignited, causing a massive explosion with such force that the entire building moved an inch. Mr Moody, a retired construction and electrical tradesman spent two weeks in hospital undergoing skin grafts after suffering serious burns to his hands, arms and scalp. His wife suffered burns to her legs and feet nut was released from hospital after two days.

The home, which the couple had built for themselves in 1993, sustained so much damaged that it had to be almost completely rebuilt. It was a year before the couple were able to move back in. They were also left £100,000 out of pocket after being found to be underinsured on their contents insurance and thus had to cover some of the loss themselves.

Lincoln Crown Court were told by prosecutor James Puzey that Hickley was "incompetent to carry out this work and it was carried out incompetently. That led directly to an explosion which almost destroyed the property and caused serious injury to the householders." It was also revealed that he was not a registered Gas Safe engineer and failed to tell the couple this when he agreed to do the work. However he claims that he did not know he would be working on a gas pipe and as such never put himself forward as properly qualified.

Hickley has admitted to breaching the 1998 Gas Safety Regulations and performing work to an inappropriate standard. Recorder Helen Malcolm QC has adjourned the case to a future date when she will give her ruling on the case following these two days of evidence.

-----

Cases like this are a prime example of why having the right qualifications to do the job is vital. Simply having plumbing qualifications is not enough if you are potentially going to work with gas pipes, as not only are you breaking the law and could potentially face prosecution but you are also endangering the lives of your customers. If you train as a gas engineer, becoming Gas Safe Registered isn't just advised, it is essential proof that you are legally competent to work with gas pipes and gas appliances safely. If you are a plumber and would like to learn more about gas engineering, gaining the qualifications required to be eligable for Gas Safe registration, we at Access Training offer comprehensive gas courses to ensure you are fully trained. To find out more click the link or give us a call on 0800 345 7492.

View the amended Part P Document here: planningportal.gov.uk

As of last month the Government has wheeled out its latest changes to Part P of the Building Regulations in an attempt to cut down on the amount of “red tape”. In the eight years since its introduction Part P has been a vital measure in maintaining safety when it comes to electrical installations, making sure that professional electricians have the skill and competency needed to perform these tasks. In order to do certain installations, electricians (and DIYers) are required to gain their Part P certificate and join a Competent Person Scheme such as NICEIC, NAPIT or ELECSA.

The main change to the document is that it is now shorter and has greater clarity, with a notable reduction to the number of works that need to be notified to Local Authority Building Control. The full breakdown of changes is

  • Under the new regulations, any electrical work undertaken in kitchens or outdoors in no longer covered by Part P unless a new circuit is required. 
  • While before installers not registered with a Competent Person Scheme would have to notify their work so that a third-party inspector would need to check it, now these installers can instead use a registered third-party (e.g. another electrician) to sign off their work. This eliminates the cost of producing Building Regulations Compliance Certificates for some minor works, but importantly, the new regulations still retain the need to issue Electrical Installation Certificate Reports (EICRs) for all work carried out within a dwelling.
  • Reference is now made to BS 7671:2008 incorporating Amendment No. 1:2011.

The main positive that has come out of these changes is the potential new areas of work it opens up for Part P qualified electricians who can earn more from inspecting and signing off other people’s work. Organisations have also commended this new streamlined document for not compromising on safety.

However while the ESC (Electrical Safety Council) has praised the fact the Government is amending Part P, they have expressed concern over some of the changes. They believe that the areas that have seen a reduction in notifiable are reasonably high-risk according to data, and so “any electrical work must be of a particularly high standard”.

The third-party certification is also still in question, as the rules for the Approved Inspector Scheme are currently unclear. The document itself is likely to go under review again in 2015.

The Department of Energy and Climate Change (DECC) today released the latest Green Deal statistics, and already there has been warnings coming from various different groups and companies.

Insulation company Knauf has warned that according to the current rate, it will take more than 200 years to reach the Government’s 2020 targets. This comes following the revelation that only 2031 more Green Deal assessments place in April than March, suggesting that interest may already be starting to stagnate.

Northern Europe Knauf Managing Director John Sinfield said: “These figures confirm the industry’s worst fears – that the Green Deal has been strangled at birth by the complete lack of any real incentive to encourage uptake amongst householders. If this rate of activity evens out at 10,000 assessments a month it will take 116 years to reach the original DECC aspiration of tackling 14 million homes – and that assumes an optimistic 100 per cent conversion rate from assessment to Green Deal. At a more realistic rate of 50 per cent it will take 232 years to achieve this goal!

“Therefore, our argument to Government is that a significant ‘demand driver’ is urgently needed in order to create momentum amongst householders. The Government claims that the Green Deal is a market driven mechanism yet as currently designed it will only appeal to a small subset of the population. The Green Deal must be made attractive to ALL householders if it is to stand any chance of success. Cashback should be broadened from just Green Deal to all boiler and insulation retrofits.”

However the slow-down in progress could be due to a “severe shortage” of building companies registered as installers, says The Federation of Master Builders in an unrelated assessment based on the same set of statistics. With only 942 companies approved to carry out the work, the FMB has warned that this is nowhere near enough to deliver targets.

Chief executive Brian Berry said: “There are more than 240,000 companies in the construction industry that employ fewer than 14 people. These companies are often best placed to carry out Green Deal work, but because it is difficult to access the market, they are reluctant to train the number of approved installers needed to retrofit Britain’s building stock.

“The Green Deal has now been open for business for almost four months and demand for work under the initiative appears to be growing, but it still feels like a missed opportunity to the majority of SMEs in the industry who haven’t seen any sign of transformation in the energy-efficiency market.”

In order to combat this, the FMB plan to introduce a “Strategy for the Low Carbon Building and Refurbishment Market”. This will involve giving its members better access to the training and certification required to carry out these areas of work.

Sources: Knaufinsulation.co.uk

theconstructionindex.co.uk

Just over a month after the announcement that the start of the Renewable Heat Incentive would be delayed until Spring 2014, the UK Government has also delayed the introduction of proposed "smart meters" to 30 million homes until Autumn 2015.

The £11.7 billion project has been considered vital to getting householders to cut their energy use as the country faces having to import more energy in the future. These smart meters record consumption of gas and electricity in hourly intervals, regularly communicating the information back to the utility provider for monitoring and billing purposes. While the project is set to start in 2015, its estimated that the move to install these into every home won't be completed until 2020.

Angela Knight, chief executive of Energy UK, noted that installing these meters is going to be a "complex task" and this delay will allow the changeover to happen more efficiently. She said: "We welcome the government's prudent decision to allow an additional 12 months to complete the smart meter programme. This recognises the scale of the programme and the need to prepare carefully."

Energy Secretary Ed Davey added: "Completing the national rollout will be an enormous logistical and technical challenge for the industry. Getting this right for consumers is the government's priority."

However the Government will be taking measures to speed up the introduction despite delays. From the end of 2013, when a customer switches from a supplier who has provided them with a smart meter, the new supplier has to either rent the previous supplier’s meter or install their own smart meter, helping to gradually phase out old equipment. This also makes sure that suppliers don’t lose out when they become early adopters. There are also proposals to require energy suppliers and network operators to comply with the Smart Energy Code and ensure their smart meters really perform their advanced functions and supply data to customers.

Further reading: http://www.bbc.co.uk/news/business-22480068

http://www.techweekeurope.co.uk/news/smart-meter-roll-out-delayed-until-autumn-2015-116011

http://www.ft.com/cms/s/0/70d66e86-b97b-11e2-bc57-00144feabdc0.html#axzz2TFaAEogR

With Action Fraud recently reporting that fraudsters in Caerphilly have begun to use the Green Deal as a means of conning unwitting householders, it’s important that people know the basics when it comes to this new Government initiative.

The Green Deal’s aim is to encourage home and business owners to adopt more energy-saving technology in their properties, with the incentive of no upfront costs. Examples of possible improvements include:

  • Insulation (Such as loft or cavity wall insulation)
  • Heating
  • Draught-proofing
  • Double glazing
  • Solar panels/wind turbines

The installation cost will eventually be paid over time through your energy bill. What makes this unique is that the bill is attached to the property rather than the person, as this is where the money is being saved.

 

What to do to get involved

  • You will need to get an assessment of your property so that it can be determined what improvements can be made to your home. The assessor will also explain how much money you could be saving on your energy bill.
  • Choose a Green Deal provider to do the work for you. All Green Deal providers will have a mark of quality (pictured below) – it’s important you look out for this to make sure you are getting the right people for the job.

  • If you agree to the work, you will be signing a Green Deal Plan which is a contract stating what work is being done and how much it costs. Once the work is done, you’ll pay off the cost periodically through your electricity bill.

Further reading: https://www.gov.uk/green-deal-energy-saving-measures/?&gclid=CMjpsI3I6LYCFe3MtAod7kQAlw

http://www.greendealinitiative.co.uk/

Part P Changes

In 2013, the Government made important changes to Part P of the Building Regulations. These are the regulations that ensure that all fixed electrical installations in domestic dwellings are suitably designed, installed, inspected and tested to provide reasonable protection against becoming a source or fire or a cause of injury to persons.

These changes to the Part P of the Building Regulations consisted of two principel modifications, the first of which reduces the range of electrical installation work that needs to be notified. Previously, electrical work undertaken in kitchens (such as adding a new socket) or gardens (installing security lights) were among the work you'd need to be Part P qualified to perform without having to notify an inspector. However now these tasks will no longer be notifiable unless a new circuit is required.

There are three main areas where electrical work will still be notifiable due to Part P of the Building Regulations, and these are:

  • Any work involving the installation of a new circuit
  • The replacement of any consumer unit
  • Any addition or alteration to existing circuits in a special location
In this instance, "special location" can mean two things, the first of which is any room containing a swimming pool or sauna heater. Secondly, it is any room containing a bath or shower, where the space surrounding a bath tap or shower head extends vertically from the finished floor level to a height of 2.25m, or 2.25m from where the shower head is attached. This can also apply horizontally, where the bathtub or shower tray has a distance of 0.6m. Alternatively, where there is no bath tub or shower tray from the centre point of the shower head where it is attached to the wall or ceiling to a distance of 1.2m.
 
The second part of these changes to the Part P of the building regulations relates to the use of a registered third party to certify notifiable work. Previously, any electrician undertaking work that fell under Part P not registered with a competent persons' scheme was required to notify their local authority's building control. They would then send out an independent inspector who would determine if the work was acceptable.
 
However, these changes mean that electricians not registered with a competent persons' scheme have to get their work signed off by a registered third party. For more information, visit the official Government Part P document.
 
Are you looking to become Part P qualified? Not only will this enable you to register with a competent persons' scheme and allow you to self-certify your own work (saving you hundreds of pounds), but could also potentially provide you with a whole new area of work when the third party approval system is finalised. Here at Access Training we offer a wide range of electricial courses, including specific Part P Training. If you would like to find out more, give us a call on 0800 345 7492.

The Government has sparked more frustration from industry members as it announced yet another delay to the start of the long-awaited Renewable Heat Incentive (RHI).

The scheme, which was designed to encourage renewable heating systems to be installed in domestic properties and offer money towards those who have fitted renewable heating products, was meant to launch this Autumn but has now been pushed back until Spring 2014.

Greg Barker, the Energy and Climate Change Minister, said: "The RHI, which has been available for non-domestic investors for over a year, is a key part of our approach to cutting carbon and driving forward the move to more sustainable low carbon heating alternatives."

"We remain committed to introducing an incentive scheme for householders too, and have set out an updated timetable for its launch alongside new plans to extend our renewable heat voucher scheme in the meantime."

However this isn't enough for many leading industry members, who have vocally expressed their disappointment at the delay. Jim Moore, of leading heating and boiling manufacturers the Vaillant Group has said: "The Government now needs to deliver on its latest deadline to assist in stimulating increased uptake of renewables in the UK as has been demonstrated as effective in so many European markets."

Elsewhere, chief executive of the Micropower Council Dave Sowden has commented: "Taken with the delay in confirmed the next steps of the 'zero carbon homes' policy, the announcement is forcing the industry to question whether the Coalition is serious about promoting domestic renewable heat during this Parliament."

Coinciding with this announcement was also an action plan looking at the potential to cut emissions from heat across the whole of the UK economy. It focuses on a number of key actions in an attempt to spur on the move to low carbon heating alternatives and drive forward green growth. These include;

  • A £9 million package to help local authorities get heat network schemes up and running in towns and cities across the country, with a new Heat Networks Delivery Unit to sit within the Department of Energy and Climate Change (DECC) providing expert advice.
  • £1 million for Manchester, Leeds, Newcastle, Sheffield and Nottingham to help them develop heat networks.
  • 100 green apprenticeships to be funded primarily for young people in small scale renewable technologies.
  • Up to £250,000 for a new first-come-first-served voucher scheme for heating installers to get money off the cost of renewable heating kit installation training, with up for £500 or 75% of the cost of the training per person.
  • Working with individual industrial sectors to design long-term pathways to cut carbon across UK industry.

It may be an apocryphal tale, but in the days of the Empire it is said that many passengers embarking for the tropics were persuaded to buy small packages labelled "Insect Destroyer", and further labelled with the instructions "do not open until required". When the packages were finally opened, it was discovered that they contained only two small blocks of wood and the instructions "Place the insect on one block and strike sharply with the other".

In these days of Consumer Protection and Trading Standards it might be hoped that this type of con is very much a thing of the past, but according to a report from the Electrical Safety Council, it is still very much with us. The latest manifestation is a range of "plug-in energy savers", normally sold over the internet pr at car boot sales.

These devices claim to save money on electricity bills by doing some kind of "conditioning" to the supply which makes appliances run more efficiently. This is nonsense. The Electrical Safety Council tested four different models, all of which actually increased power consumption rather than reducing it.

More worryingly, all the devices tested failed to meet basic product standards. In all cases the pin dimensions were not correct. This means that the device would be a loose fit in the socket-outlet, which would cause arcing and overheating. All the devices tested were also of poor internal construction, making them a fire hazard. Several of them were CE marked, but the poor quality of construction would suggest that these marks were almost certainly forgeries. 

There have been reports that these devices are also being sold over the phone. Many elderly people have been targeted by telephone sales calls purporting to originate with one of more of the energy suppliers. Often the caller has the persons' name and address, and on some occasions even part of their credit card number. These calls are bogus and originate overseas, many from a holding company in the USA.

If you should be offered one of these devices, Action Fraud (www.actionfraud.police.uk) would like to know. You can also contact them on 0300 123 2040.

- Mark Jenkins

Get in touch to learn more about our training courses!

First Name *
Surname *
Telephone Number *
E-mail address *
Ask A Question *
 
Security Character Security Character Security Character Security Character Security Character Security Character
Enter Letters (No Spaces) *