The short answer: No, in the UK, you cannot sign off electrical work in your own home unless it is considered “non-notifiable” work.

For any significant electrical work, you must hire a qualified electrician who is part of a government-approved Competent Person Scheme and registered under Part P of the Building Regulations. They will be able to self-certify their work and sign it off with an Electrical Installation Certificate (EIC) which ensures all work meets safety standards.  

What Is “Non-Notifiable” Work?

Non-notifiable work refers to minor electrical alterations, for example:

  • Changing a light switch
  • Moving a socket outlet
  • Moving cables
  • Replacing damaged cables
  • Replacing light fittings or control switches
  • Adding a fused spur to an existing circuit

However, it is important to note that if the work being carried out is in a ‘special location’, like a bathroom, sauna or outdoors, you must notify your local building control.

What is “Notifiable” Work?

Notifiable work includes:

  • Adding new circuits/ installations
  • Work in special locations i.e. bathrooms or outdoor
  • Changing a fuse board on a consumer unit
  • Rewiring all/part of a house

All notifiable work must be signed off by a registered electrician, who is then responsible for notifying the local authority. Attempting to self-certify any complex electrical work is not only extremely dangerous but will leave you liable if issues arise later on.

Plus, if your electrical work isn’t properly certified, it can invalidate your home insurance in the case of an electrical incident!

Wanting to save the hassle and get qualified as an electrician? Here at Access Training, we offer a range of electrician courses, suited to everyone, no matter your experience level. Get in contact with us today to find out more!

Contact Access Training   Contact Access Training

can a plumber install an electric shower

If you’re looking to install a new electric shower, you may be wondering whether you should call a plumber or an electrician. A plumber will be well-equipped to handle the water supply connections and pipework you will need for your new shower; however any electrical work should always be carried out by a Part-P qualified tradesperson.

This Part-P qualified tradesperson will need to be able to:

  • Assess your current electrical system to ensure it can handle the additional load of the shower.

  • Choose the correct cable size for the shower’s power rating.

  • Have access to the equipment needed to test new electrical equipment and installations.

  • Correctly fill out an electrical test certificate for the job.

  • Safely connect the shower unit to the electrical supply.

  • Test the installation to ensure it functions safely.

  • Inform the local building authority control to let them know that electrical installation work has been carried out in a room containing a bath or shower.

 

In summary, you will need to find either a qualified electrician or a Part-P certified plumber to install your electric shower, as they will be trained in both the plumbing side of the installation and qualified to do the electrics.

This is essential due to the dangerous combination of water and electricity that this job involves; hiring someone that is not experienced or qualified for the job will not only be hazardous but will ultimately cost you a hefty sum for repairs in the future.

  

Do you wish you could install your electric shower yourself? Why not considering changing careers and training as an electrician?

Access Training offer a number of bespoke electrician courses to people of all ages and backgrounds. With qualifications including general installationPart P trainingPAT Testing and more, we're certain we have the right electrical course for you.

Get In Touch & Enrol Today!

An ex All-Black and Cardiff Blues captain, former rugby player Xavier Rush is currently training here at Access Training after retiring from sports and deciding to earn the qualifications to start a new career in property development. After completing an intenstive kitchen fitting course, he has decided to continue his training and earn additional qualifications in electrics and plumbing. We caught up with him again as he progressed through the professional electrician's course to see how he's getting on with starting his new life...

Xavier Rush hard at workSo how has your electrical training been going so far?

Busy, very busy! But good – I’ve been doing my Part P and 17th Edition, had an exam yesterday which I passed so I’m very happy about that. I wasn’t looking forward to doing a resit on Friday so I’m glad I’ve managed to avoid that. But it’s an intense course this one, and you don’t have much time to muck around. It’s intense, but its short and you get a lot of information which is great.

How have you found the balance between theory and practical learning?

You’re getting a good mix of both here. I think Martin [One of the electrical tutors] teaches it very well. I’ve enjoyed his style and the environment of working with all the other students as well. We come from all walks of life and backgrounds, but we’ve all got that one common goal of getting our qualifications. And we’re all here to learn, it’s very different to school – everyone’s here because they want to be here.

How has the electrical course compared to the kitchen fitting you were doing previously?

Kitchen fitting and carpentry is a lot more hands-on, which I’m more used to. The electrics is where you have to get the old brain working in gear. It’s been a while since I’ve had to sit in a classroom but again as I said Martin makes it interesting and mixes it up. And that’s helped us all.

Did you find you were fully prepared for the exams?

Well it’s a two and a half/three week course, so you’ve just got to make sure that you keep yourself pretty quiet over these weeks so at the end of it you get the pass mark. The first exam wasn’t bad at all but this one...it was an open book exam with the regs but it can be tricky. Its multiple choice (or multiple guess in some situations!) but I feel we covered it well in our teachings and you’ve just got to know your way around the book really.

We all passed in our class so we must have been fairly well prepared, especially when you never know what they’re going to chuck out at you. Every exam is different from everyone else’s.

So what will you be moving onto next?

I’m doing my PAT testing now, then have a nice week’s break and come back and nail my plumbing. I’m over the moon that I’m now a qualified domestic installer than can self-certify my own work. If you look at apprenticeships when I was finishing school that would have been a seven year course and even at the end you might not know as much as you’re given here. You’d have a fair bit of experience on the job but you’re in a good position to move on now and either do your own work if you feel confident enough or work for someone for a while before that.

Finally, what advice would you give to someone thinking of doing an electrical course or even completely changing careers like you have?

They need to remember that the courses are intense – you learn a lot of information so you want to make sure you go home, you get your sleep, your rest and your revision. Because you are slamming a lot of information into a small amount of time so you want to make sure you take in as much of it as possible. It’s a fun, enjoyable environment to learn in and the tutors. You’re learning from top guys so it’s been well worth the experience.

If you’ve wanted a career and want more of a hands-on trade and a change from what you’ve been doing I definitely recommend it. I certainly wouldn’t be here if I thought it was a waste of time. This is a great environment to come in and start.

We'll be catching up with Xavier Rush again after his week off, so if you have any questions you'd like to ask him please let us know via Twitter or Facebook. If you would like more information on taking the steps to change your career and become a professional tradesperson, please get in contact with one of our course advisers. Access Training offer courses in plumbing, electric, gas and construction (plastering, tiling, carpentry and painting & decoration) and they'd be happy to answer any questions. You can contact them on 088 345 7492.

View the amended Part P Document here: planningportal.gov.uk

As of last month the Government has wheeled out its latest changes to Part P of the Building Regulations in an attempt to cut down on the amount of “red tape”. In the eight years since its introduction Part P has been a vital measure in maintaining safety when it comes to electrical installations, making sure that professional electricians have the skill and competency needed to perform these tasks. In order to do certain installations, electricians (and DIYers) are required to gain their Part P certificate and join a Competent Person Scheme such as NICEIC, NAPIT or ELECSA.

The main change to the document is that it is now shorter and has greater clarity, with a notable reduction to the number of works that need to be notified to Local Authority Building Control. The full breakdown of changes is

  • Under the new regulations, any electrical work undertaken in kitchens or outdoors in no longer covered by Part P unless a new circuit is required. 
  • While before installers not registered with a Competent Person Scheme would have to notify their work so that a third-party inspector would need to check it, now these installers can instead use a registered third-party (e.g. another electrician) to sign off their work. This eliminates the cost of producing Building Regulations Compliance Certificates for some minor works, but importantly, the new regulations still retain the need to issue Electrical Installation Certificate Reports (EICRs) for all work carried out within a dwelling.
  • Reference is now made to BS 7671:2008 incorporating Amendment No. 1:2011.

The main positive that has come out of these changes is the potential new areas of work it opens up for Part P qualified electricians who can earn more from inspecting and signing off other people’s work. Organisations have also commended this new streamlined document for not compromising on safety.

However while the ESC (Electrical Safety Council) has praised the fact the Government is amending Part P, they have expressed concern over some of the changes. They believe that the areas that have seen a reduction in notifiable are reasonably high-risk according to data, and so “any electrical work must be of a particularly high standard”.

The third-party certification is also still in question, as the rules for the Approved Inspector Scheme are currently unclear. The document itself is likely to go under review again in 2015.

Part P Changes

In 2013, the Government made important changes to Part P of the Building Regulations. These are the regulations that ensure that all fixed electrical installations in domestic dwellings are suitably designed, installed, inspected and tested to provide reasonable protection against becoming a source or fire or a cause of injury to persons.

These changes to the Part P of the Building Regulations consisted of two principel modifications, the first of which reduces the range of electrical installation work that needs to be notified. Previously, electrical work undertaken in kitchens (such as adding a new socket) or gardens (installing security lights) were among the work you'd need to be Part P qualified to perform without having to notify an inspector. However now these tasks will no longer be notifiable unless a new circuit is required.

There are three main areas where electrical work will still be notifiable due to Part P of the Building Regulations, and these are:

  • Any work involving the installation of a new circuit
  • The replacement of any consumer unit
  • Any addition or alteration to existing circuits in a special location
In this instance, "special location" can mean two things, the first of which is any room containing a swimming pool or sauna heater. Secondly, it is any room containing a bath or shower, where the space surrounding a bath tap or shower head extends vertically from the finished floor level to a height of 2.25m, or 2.25m from where the shower head is attached. This can also apply horizontally, where the bathtub or shower tray has a distance of 0.6m. Alternatively, where there is no bath tub or shower tray from the centre point of the shower head where it is attached to the wall or ceiling to a distance of 1.2m.
 
The second part of these changes to the Part P of the building regulations relates to the use of a registered third party to certify notifiable work. Previously, any electrician undertaking work that fell under Part P not registered with a competent persons' scheme was required to notify their local authority's building control. They would then send out an independent inspector who would determine if the work was acceptable.
 
However, these changes mean that electricians not registered with a competent persons' scheme have to get their work signed off by a registered third party. For more information, visit the official Government Part P document.
 
Are you looking to become Part P qualified? Not only will this enable you to register with a competent persons' scheme and allow you to self-certify your own work (saving you hundreds of pounds), but could also potentially provide you with a whole new area of work when the third party approval system is finalised. Here at Access Training we offer a wide range of electricial courses, including specific Part P Training. If you would like to find out more, give us a call on 0800 345 7492.

Get in touch to learn more about our training courses!

First Name *
Surname *
Telephone Number *
E-mail address *
Ask A Question *
 
Security Character Security Character Security Character Security Character Security Character Security Character
Enter Letters (No Spaces) *